Cavan Hospital Car Park Extension

Client: Cavan General Hospital
Architect: Elliott Group Co. Cavan
Works Contractor & PSCS: SEM Construction

The development consists of the construction of a new 150 space carpark to the east which was extended to a further 100no spaces during the works. Excavation & disposal of 15,000m³ ofmixed material.

  • Reduce dig & disposal off site

  • Stone fill

  • Drainage & services

  • Kerbing

  • Paving

The enabling work for the proposed new A&E department consist generally of diversion of existing services.

  • New 2no 150mm watermain

  • Removal of old asbestos pipe

  • Connection to hospital

  • Sluice Valves & Hydrants