  • Removal of 124m conveyor belt and supporting steel infrastructure

  • Creation of safe working zone & exclusion zone

  • Manual scaling of back & sidewalls before & after dismantling conveyor infrastructure

  • Snip & remove conveyor belt using 8t hydraulic metal shears in sizeable chunks

  • Remove conveyor infrastructure incl, old steel stringer sections & trough rollers

  • Removal of steel / materials to surface for controlled disposal